OPTIMAL POWER ANALYSIS FOR THE INSTALLATION OF ON-GRID ROOFTOP PHOTOVOLTAIC SOLAR SYSTEMS (RPVSS) IN THE INDUSTRIAL ENGINEERING LABORATURIOM BUILDING, BUKIT INDAH UNIVERSITAS MALIKUSSALEH, LHOKSEUMAWE ACEH


Abstract

Nationally, Indonesia has targeted renewing up to 23% of its mix renewable energy sources by 2025. To support the program, the government has also planned the construction of Rooftop Photovoltaic Solar Systems (RPVSS); in this case a roof-top plant. Industrial engineering laboratory building, Bukit Indah, Universitas Malikussaleh. Potential energy calculation to be generated from the installation of on-grid roof-top solar power plants using the Global Solar Atlas application based upon the area of ​​the roof and also the optimization of energy absorption based on data on electricity usage from the laboratory building for the last 3 months using the data usage of energy transaction measurement tools, namely kwh meter. Results of the analysis disclosed that 115 solar panel (300 WP Shinyoku Polycrystalline) need to be installed in order to obtain the maximum RPVSS power. 34,429Wp power would be produced using 21% of the building roof area to supply maximum load at noon at 17,559 Wh.

Tidak ada komentar:

Posting Komentar